A shared garage is both an electrical system and a parking operation. A plan needs to connect the building’s service and meters to actual stall locations, resident demand, future loads, and the charging service the building wants to offer. Start with the whole garage; a single resident’s charger request may be the first signal of a shared need.
1. Map the spaces and routes
Mark assigned, unassigned, visitor, indoor, and outdoor stalls. Show likely charger locations, panel and electrical-room locations, possible cable routes, and any parking or access constraints the building already knows about. Note which spaces residents can use for longer periods and which turn over during the day.
This map helps a professional consider route length, practical access, and where equipment might go. It does not establish that a route is permitted or that a space is electrically suitable.
2. Identify the service, loads, and meter arrangement
Gather available electrical drawings, service records, account information, meter locations, and utility data. Ask which existing building loads share the supply and which future work is being considered, such as heating or cooling electrification. Record known peak-demand information where available.
Utility bills or historical usage can support the assessment, but they do not prove how much EV capacity is available. The electrician or electrical designer must evaluate the system. The capacity assessment checklist explains what to prepare.
3. Ask residents what service would work
Record current interest and expected future demand separately. Ask about vehicle use, typical arrival and departure times, daily charging need, and whether residents would use assigned or shared stalls. Also agree what the building means by “charging available”: for example, a guaranteed stall, shared access, or a charge that may slow during busy periods.
Do not translate resident interest directly into a charger count. A professional needs to evaluate the demand assumptions alongside equipment, parking, service, and applicable requirements.
4. Compare scenarios and set a service promise
Ask the designer to compare reasonable configurations. Depending on the site, these might include individual circuits, lower-power equipment, shared circuits, load management, a service upgrade, or staged installation. Compare each against route constraints, expected charging time, controls, utility coordination, accessibility, and future electrical loads.
Compare the arrangement against the parking pattern, not only the electrical equipment:
| Scenario | Site questions | Resident-service measures |
|---|---|---|
| Assigned private points | Which stalls and routes are assigned, and what future access is preserved? | Energy available by each driver’s departure; who cannot use an assigned point |
| Shared pool with vehicle moves | How are spaces accessed, and who coordinates moving or releasing a vehicle? | Waiting, moves, predictable access, and the burden on residents who cannot move a vehicle |
| Grouped power sharing | Which chargers share a defined limit, and what loads and controls are included? | Energy by departure, simultaneous requests, allocation, and reduced service during faults |
| Lower-power service | Do overnight or long dwell times and local travel needs make slower charging useful? | Energy by departure, time plugged in, access to other charging for occasional longer trips |
For every option, record the assumptions so the comparison can be revisited:
| Scenario record | Details to preserve |
|---|---|
| Load data | Source, account and meter coverage, included loads, units, interval or billing window, date range, missing periods, and authorization; label energy history separately from a peak report or engineering estimate. |
| People and use | Current and future resident/vehicle counts, arrival, dwell and departure patterns, and energy needed by departure. Mark forecasts and unknown priorities as assumptions. |
| Other building demand | Existing and planned heating, cooling, hot-water, ventilation, and other electrical loads that compete for capacity. |
| Parking and routes | Assigned/shared/visitor stalls, access needs, equipment locations, route constraints, vehicle moves, and spaces preserved for expansion. |
| Controls and service | Loads and chargers in the control boundary, operating limit, expected service, failure/communications fallback, and who responds to reduced service. |
| Utility and review | Serving utility, account authorization, connection assumptions or offer limits, outstanding utility questions, and the professionals/approvals still needed. |
| Reassessment trigger | A date or event for review, such as added building loads, higher adoption, a change in parking use, or a change in utility terms. |
For a Great Britain development, add the serving DNO’s current connection requirements and record requested loads, firm or flexible terms, any curtailment periods, and the service available while curtailed. The 2023 government policy describes development-level connection inputs and flexible offers; it is not a current block-of-flats application guide. A DNO limit is separate from a building’s internal charger controls.
For a UK Power Networks-served block, use the building-network and connection guide to identify the internal-network contact and prepare the separate distributor handoff. It does not establish a site’s load or charger count.
Peninsula Clean Energy’s reported Millbrae case illustrates a lower-power option worth testing when a garage has long dwell times: the 2020 project installed nine Level 1 outlets across two older multifamily buildings with 18 parking spaces. This case establishes no transferable cost, panel capacity, charging service, or design ratio. See service upgrade versus load management for a fuller comparison of the alternatives.
5. Keep a decision record
Save the garage map, assumptions about resident demand, available utility records, professional findings, chosen meter and operating concept, and unresolved questions. Record who is responsible for requesting utility information and which approvals or permits remain before construction.
A Vancouver strata project reported by BC Hydro illustrates why the record should include coordination among the strata, contractor, city permitting, and utility, as well as verified existing electrical-room equipment. That project is one local example; its design, timing, rebates, and cost are not a template for another garage.
Board-ready checklist
- Map every stall and plausible equipment route.
- Identify the building service, panels, meters, utility, and known loads.
- Gather historic use data if available and document its limitations.
- Estimate current and future resident needs without turning them into a charger quota.
- Ask a qualified professional to compare upgrade, lower-power, shared, managed, or phased options.
- Define the resident service promise and fallback during limits or outages.
- Record utility, building, design, permit, and inspection steps.
For a long-term retrofit or new build, continue to the guide on EV-capable, EV-ready, and equipped buildings. Operating rules and resident access belong in shared charging operations.
For a complementary condo or strata view of charger approvals, cost allocation, and ongoing responsibility, see this EV charger cost and decision guide.