Charging by the kilowatt-hour (kWh) requires more than a number in a charging app. If a fee is based on measured electricity, the operator needs to confirm that the transaction, charger, measuring system, software, and verification records fit the current Canadian measurement rules. The exact answer depends on who is charging whom, how the building describes the fee, whether the equipment is public or private, and which device and approval pathway are involved.
This guide focuses on the meter and data trail for a shared residential charging system. It does not set the building’s price, allocation, or resident billing policy.
First define the transaction
Write down who owns and operates the charger, who supplies electricity, who receives the payment, who is charged, and what the resident is told they are buying. Clarify whether the amount is calculated from energy, elapsed time, a flat charge, or a service bundled with parking. Do not assume that reimbursement, rent, a common expense, and a public charging sale are treated identically.
Measurement Canada says a metered EVSE used for kWh-based trade must follow an applicable type-approval or temporary-dispensation path, subject to the stated exception for equipment without an internal meter to regulate electricity flow. Its temporary dispensation guidance lists owners and renters living in multi-unit residential buildings among possible non-commercial users. The device, applicant, measured-energy transaction, and other program conditions must still qualify; a shared garage is not automatically eligible. Ask the owner or network operator to identify the application and covered device, then confirm the actual transaction with Measurement Canada or qualified counsel before setting a tariff or promising a per-kWh rate.
The current guidance gives different application deadlines: 31 December 2027 for Level 1 and 2 devices and 31 December 2029 for Level 3 and higher devices. It says a temporary dispensation ends on 1 January 2030 or when the device is verified and sealed, whichever comes first. Some device cohorts also need specified accuracy evidence. These dates are application deadlines, not proof that a device qualifies or has been accepted; check the live program conditions, device level, in-service date, applicant, and transaction before relying on them.
Verify the exact charger and approval record
Ask the manufacturer, importer, or supplier to provide the charger’s exact model and the approval record that applies to its energy-measurement function. Search Measurement Canada’s Notice of Approval database by device type, measured product, manufacturer, model, approval number, or applicant, then read the exact notice and its conditions. A search result, general product listing, energy-monitoring feature, dashboard value, or OCPP certificate does not by itself prove that the meter is approved for the transaction.
Approval is device- and submission-specific. Measurement Canada’s EVSE-01 bulletin applies to new Level 1 and Level 2 AC equipment seeking type approval. Its current revision says applications made during 2026 are assessed against the phase-two provisional specification, while applications on or after 1 January 2027 are assessed against the full specification. This is a schedule for approval applications, not a statement that every installed charger changes status on those dates. The bulletin also says phase-one and phase-two conditional approvals must be resubmitted for phase-three assessment no later than 1 January 2029, and describes the validity and conditions of the notice of conditional approval. Ask for the actual notice and current approval-database entry for the exact model; a program timeline alone does not establish device approval.
A temporary dispensation is tied to the covered applicant and equipment. Measurement Canada says the previous owner must notify it when a dispensation-covered device is transferred and the new owner must submit a new application. Do not assume the authorization transfers with a charger, building sale, or network contract.
Check software, meters, and session records together
A billing path can run through the charger meter, local controller, network platform, payment service, and building account. Ask for a diagram and identify the source of the value shown on a receipt. Have the supplier document the meter function, software and firmware versions, any legally relevant measurement software, network interfaces, update path, sealing or adjustment controls, and the organization responsible for each record.
Separate four kinds of evidence: device approval, field verification by a provider with the applicable scope, signed transport from station to CSMS, and the billing system’s calculation and resident receipt. The Open Charge Alliance’s signed-value specification covers station-to-CSMS transport; it does not establish Measurement Canada approval, successful receipt by the billing system, correct pricing, or a complete customer record. Keep each check with its own owner and record.
Use acceptance tests that follow one real charging session through the full path:
- compare the device’s measured energy with the station display and resident receipt;
- confirm the units and rounding used on the receipt and invoice;
- check that a communication failure does not silently lose, duplicate, or alter the session record;
- verify who can change tariffs, measurement settings, meter data, or the account record;
- preserve the approval, verification, repair, and inspection records with the equipment inventory.
Measurement Canada’s published phased-approval bulletin lists requirements involving stored and transmitted data, displays, transaction information, and measurement. The agency’s Level 1 and 2 inspection consultation closed on 3 August 2026. Its linked PS-EVSE-03 specification remains marked as a draft and proposes verification checks at each port, cable, and standard connector type. Do not treat that text as a final rule; ask Measurement Canada which current test procedure applies to the actual device.
Measurement Canada’s S-A-01 accreditation criteria were revised on 11 September 2026 to include EVSE inspection and reverification within the relevant scope. That update does not show that a particular provider or technician has the scope needed for a specific installation. Request the provider’s current EVSE scope, the responsible technician’s recognized qualifications, the applicable procedure, and the as-found/as-left records for the exact equipment. Provider scope and field verification remain separate questions from device type approval.
Keep evidence after installation
Before residents begin paying by measured energy, request:
- The type-approval number and scope for the exact charger model and metering function.
- Any conditional approval notice or dispensation and its date, conditions, and expiry.
- The verification record, test method, responsible service provider, and next required check.
- The software and firmware versions associated with the approval and the process for controlled updates.
- The path from charger meter to network records, invoice, resident receipt, and dispute investigation.
- The party responsible for registering, maintaining, and retaining the required device and transaction records.
If a charger, meter, software version, network, or contract changes, re-check the approval and measurement implications before continuing the same kWh calculation. A system may still be useful for monitoring when it is not approved for measured-energy trade, but do not describe monitoring output as an approved billing meter without confirmation.
Resolve the neighboring building decisions
Meter approval does not determine whether the building may charge a particular rate or how costs should be shared. Agree the resident-facing pricing and allocation policy separately, and check provincial, territorial, utility, condominium, contract, and consumer-protection requirements where relevant. Use the shared charging policy guide for operating rules and the metering overview for the building’s broader meter arrangement.